Dedicated Professional Leading Manufacturer of EPE Machines and other Foam Machinery 

ShIP to

Improper operation of electric welders caused benzene board fire

by:Veinas      2021-08-07
Xinbao News (Reporter Yang Yadong, Correspondent Liu Wenhua) The reporter learned from the fire brigade of Aluhorqin Banner, Chifeng City, Inner Mongolia on the 9th that Wang, a welder, was detained by the public security authorities for 5 days due to improper operation causing a fire. According to reports, at 14:00 on December 11, 2011, a fire broke out in the equipment room on the top of the teaching building of the fifth middle school in Aluhorqin Banner, Chifeng City. Fortunately, no casualties were caused. After the fire was extinguished, the investigators learned through on-site inspections that at the time of the incident, the electric welder Wang was installing external clocks in the teaching building. During the electric welding, the combustible benzene board material inside the building was not cleaned and flame-retardant. Measures, high-temperature welding slag scattered and ignited the benzene board, resulting in a fire. Subsequently, the staff of the fire brigade of Aluhorqin Banner made a fire accident determination, and determined that Wang’s improper operation caused the fire. On January 7, in accordance with the relevant provisions of the 'Fire Protection Law of the People's Republic of China,' the local public security agency made a decision to impose a penalty of administrative detention on Wang for 5 days. Source of this article: Zhengbeiwang.com-the homepage of Inner Mongolian news. Follow the news you care about most.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...